Today was a big day! Celebrating with a bottle of red wine. I met with our manufacturer and paid the deposit to have the injection molds made and to have them produce 20 production quality Warm It!™ warmers.

It’s been a slower process than I could have ever expected, but I am thankful for their help in getting it right. Can’t wait to test these out and then put in a big production run.

Time to celebrate!

Kristin